Putra Perkasa Abadi Wins a Cooperation Contract with Adaro Indonesia
By
PPA Corporate Communication
Date
30 Jun 2022, 09:06
left to right - PPA Director R Teguh Sabtosubroto, SIS Operations Manager Sugeng Wibowo and Adaro Indonesia Mine Technical Head Suhernomo, sounding the siren that marks the start of PPA's operations at Site Adaro Indonesia, Wara mine
As reported by wartaekonomi.co.id, PT Putra Perkasa Abadi (PPA) won a cooperation contract at Site Adaro Indonesia through PT Saptaindra Sejati - Adaro Services. The cooperation was marked by a First Cut Operation Ceremony signalling the start of mining operations.
Under this first contract, PPA will deploy 7 fleets of heavy equipment consisting of 4 PC2000 fleets and 1 PC1250 fleet for overburden removal, plus 2 PC1250 fleets for coal getting.
The First Cut Operation Ceremony, held at Adaro Indonesia's Wara mine, South Kalimantan, was attended by PPA Director Teguh Saptosubroto, PPA Site Adaro Operations Manager Handy Sastradi, SIS Operations Manager Sugeng Wibowo and Adaro Indonesia Mine Technical Head Suhernomo.
"Suatu penghargaan dan kebanggaan bagi Putra Perkasa Abadi dapat bekerja sama dengan Adaro Indonesia yang merupakan salah satu produsen batubara terbesar di Indonesia, kami akan memberikan yang terbaik untuk mencapai target produksi, bekerja dengan maksimal, tentu dengan tetap memperhatikan aspek safety dalam operasional," said Teguh Saptosubroto in his remarks.
This cooperation is evidence of PPA's hard work in sustaining the quality of its work through productivity, effectiveness and tightly held safety, earning the trust of PPA's clients.
With the Adaro Indonesia project and several new projects added in 2022, PPA is optimistic it can reach the top 3 mining services companies in Indonesia by the end of the year, with total overburden removal production of 267 million BCM.
"Dengan kesempatan ini, membuka potensi mewujudkan visi dan misi PPA untuk menjadi 3 besar perusahaan jasa pertambangan di Indonesia, bahkan dengan tambahan beberapa project baru dan pertumbuhan produksi di project existing, kami optimis dalam 2 tahun kedepan, PPA dapat meraih posisi 2 besar," affirmed Teguh Saptosubroto.
left to right - PPA Director R Teguh Sabtosubroto, PPA jobsite Adaro Operations Manager Handy Sastradi and PT Adaro Indonesia Mine Technical Head Suhernomo, inspecting the Adaro Wara mine site
The new contract further underlines PPA's quality as a mining contractor that is professional in its work and experienced in its field. Beyond that, PPA stands ready to support the project by ensuring high Physical Availability (PA) and applying good mining engineering principles / GMP, supported by an integrated modern technology system to improve safety and production, in line with PPA's tagline, Safe and Strong Operational Performance.
Get our latest updates at PPA.CO.ID. Please follow our social media for news and updates — click PPA Instagram or watch the latest videos on the PPA Youtube Channel
For information on careers and job openings, please fill in the form at the following link:Careers (ppa.co.id)